Part of our Website Redesign Guide.
Most of the damage a redesign does happens in the hours either side of launch: a form that sends to an old inbox, a staging site left open to Google, redirects that were never switched on. This checklist is the one we work through on every project. Copy it, and tick it off in order.
Before the redesign starts
- Write down the goals in numbers (for example: 30% more booking requests).
- Export every URL: the sitemap, Search Console’s pages report and analytics’ top pages.
- Note which pages get traffic, rank, or bring in enquiries. Protect these above all.
- Record current speed, rankings for your main services, and monthly enquiries, so you can compare after launch.
- Collect logins: hosting, domain registrar, DNS, Search Console, analytics, email, forms and any booking or payment tools.
- Take a full backup of the current site and database.
- Agree the scope, price, timeline and who owns the finished site, in writing.
During the build
- Build on a private staging site that is blocked from search engines.
- Pair every old URL with a new one in a redirect map. Keep addresses the same wherever possible.
- Carry over page titles, meta descriptions and headings, improving them rather than deleting them.
- Carry over structured data (business details, reviews, products, FAQs).
- Write descriptive alt text for every meaningful image.
- Compress and correctly size every image.
- Make the phone number tappable and the main call to action visible on every page.
- Keep forms short: only ask what you genuinely need.
- Check colour contrast, heading order and form labels for accessibility.
- Add or keep a privacy policy, and a cookie notice if your tracking requires one.
The day before launch
- Test every page on a real phone, not just a resized desktop browser.
- Submit every form and confirm each one arrives in the right inbox, and the auto-reply makes sense.
- Test booking, payments and any integrations end to end.
- Check every link and button for errors.
- Measure mobile speed and fix anything that is slow.
- Test a sample of old URLs against the redirect map on staging.
- Lower the DNS time-to-live if you are moving hosts, so the switch is quick.
- Take one more backup of the old site.
Launch day
- Switch the domain to the new site.
- Turn on search engine visibility (staging sites are usually set to hide from Google; this setting must change).
- Switch on every 301 redirect.
- Generate and submit the XML sitemap in Google Search Console.
- Confirm analytics and conversion tracking are recording visits and enquiries.
- Test the contact form once more on the live site.
- Check that email still works if DNS records were touched.
The first month after launch
- Check Search Console every few days for “not found” errors and add any missed redirects.
- Compare rankings for your main services with the numbers you recorded before.
- Compare monthly enquiries with the old site.
- Update your Google Business Profile, social profiles and directory listings if any URLs or details changed.
- Set up updates, backups and uptime monitoring so the site stays healthy. See what website maintenance actually includes.
The three items that matter most
If you only do three things on this list, make it these: the URL inventory before you start, the 301 redirects at launch, and testing every form on the live site. Between them they prevent the most common and most costly redesign failures. For the others, see website redesign mistakes that cost small businesses customers.
Want someone to run the checklist for you? Our redesign and migration service includes all of it, starting at $2,000. Back to the Website Redesign Guide.
Want a second opinion on your own site?
Send us the address and a person will look at it properly, then email you what they find. Free, and there is nothing to buy at the end of it.